Construction excavation in the district. Suhodol - town. Sofia
Description: Construction and installation work on strengthening slopes, including supply and driving of IPE300 steel piles, laying of shotcrete, transport, rent, installation and dismantling of the Berlin Wall, delivery and installation of injection anchors.
Description: Construction and installation work for strengthening the construction excavation with metal compacted piles and 7 ÷ 10 cm reinforced shotcrete between the piles; Residential building with underground and aboveground parking spaces, shops and substation.
Restoration works on A2- Hemus Motorway, Echemishka tunnel
Description: Execution of sealing injection of caverns and voids behind the primary lining of the "Echemishka" tunnel and anchor strengthening of the tunnel structure by drilling, flushing, installation of permanent anchors IBO R32
Residential building with shops, garages, substation and underground garage, Mladost quarter, city. Sofia
Description: Construction and installation work for laying shotcrete cladding 10 cm on welded reinforcing mesh f 6,5 200/200 and delivery and installation of anchor No. 12x1.0 m
Strengthening of a landslide on Hemus Motorway, km. 26+050″
Description: Reinforcement of active landslide with retaining wall and system of self-drilling anchors T76S x 20 m, galvanized screw anchor F32, anchors GEWI ф25, shot 2 layer of total thickness 15+-5 cm., incl. reinforcing mesh №8 20/2