Mining cavern of ore body "T" in the underground copper mine Bor - Serbia Description: straight 80 and 120 tons of rope anchors, reinforcement works, sprayed concrete, delivery and installation of CIS. Performed activities: Anchor systems, Torkret Period: 2013 r. Assignor: RTB BOR
The western tank chamber 35 000 m3 – Asarel Medet AD, Panagyurishte Description: repair works and implementation of waterproofing at the tank Performed activities: Torkret Period: 2013 r. Assignor: "Asarel Medet" AD
Island "St.. Anastasia ”- town of. Burgas Description: execution of pouring reinforced concrete piles with siege, as part of the reconstruction of an existing marina for small vessels. Performed activities: Bored piles, Hydraulic Construction Period: 2013 r. Assignor: HYDROSTROY AD
Production plant - Devnya Cement AD Description: Strengthening slopes with soil nails and shotcrete Performed activities: Anchor systems, Torkret Period: 2013 r. Assignor: "VITO-95 Ltd.
Inlet pumping station of wastewater treatment plant - WWTP Sozopol Description: transport, rent, installation and dismantling of sheet piles and installation of anchors during excavation reinforcement. Performed activities: Hydraulic Construction, Sheet piles Period: 2013 r. Assignor: Weiss Profile Ltd.
SHPP "Cherepish" on the river. Iskar - municipality of Mezdra Description: Pilot foundation, execution of sheet pile walls at the right and left bank, after the expiration of SHPP "Cherepish" Performed activities: Hydraulic Construction, Sheet piles Period: 2013 r. Assignor: "KA-5" AD