Tamponing of a drainage gallery to a project “Increasing the structural security of the southern wall of Chelopech Tailings”

Description: Fill a drainage gallery with length 60 m with drainage material by shotcrete machine, working in a dry way

Performed activities:

Period:

Assignor: "Dundee Precious Metals Chelopech "

Design and construction of the Struma highway, lot 3.1 “, Section of km 359+000 up to km 360+950 and from km 361+200 up to km 365 + 500 “

Description: Execution of drilling and pouring piles ф880, L = 14.75 and self-drilling anchors R51 x 24 m

Period:

Assignor: Bul Stroy Group IG EOOD

Rehabilitation of viaducts and bridges on the Hemus Motorway

Description: Cleaning and shotcreting of crossbars, kolkoni, consoles and road plates

Performed activities: ,

Period:

Assignor: ORS Infrastructure

Extension of the metro in Sofia, third metro line

Description: Construction and installation works on constructions of ventilation and drainage station in the section MC14-MC12

Performed activities: ,

Period:

Assignor: Civil Society "DVU"

Emergency restoration of a section from st. "Stanke Dimitrov" between o.t. 48 and o.t. 49 in s. Mlamolovo

Description: Execution of IBO anchors R51x12 m

Period:

Assignor: "VIG - 66“Ltd.

Road III-5004 "Bypass of Gabrovo", part: Bridge per km 11+800 – Resistance №2

Description: Execution of IBO anchors R51x30 m

Period:

Assignor: ROAD CONSTRUCTIONS - VELIKO TARNOVO AD

Road tunnel, Pleven-Lovech-Troyan Karnare

Description: Laying of sprayed concrete in a wet way on the vault and walls of a site: „Road II-305 Pleven-Lovech-Troyan Karnare from km 37+393 up to km 46+105, part Road tunnel from km 43+286 up to 43 + 699 ”

Performed activities: ,

Period:

Assignor: ASTRA INTERPROJECT LTD