Drilling-explosive pilots to find a hose pump- Solvay Sodi AD

Performed activities:

Period:

Assignor: Solvi Sodi AD

Drilling-exploit pilots F880 – Garitage park

Description: Performance of drilling-exposure pilots F880, incl. vertical axis testing and integrity tests

Performed activities:

Period:

Assignor: Bildest Ltd.

Measures to strengthen MC1 and MC3 of the third metro line to the "Slatina" district

Description: Execution of secant borehole and discharge piles for ventilation system at MC1. Construction of Berlin Walls at accompanying tollification collectors and for strengthening excavations during the construction of the tunnel along the Milan route

Period:

Assignor: TRACE GROUP HOLD AD

Modernization of the Sofia-Dragoman railway line

Description: Execution of drilling and pouring piles F880, F1000, F1200, F1500 with casing pipe and suspension stabilizing drilling for foundation of various road facilities along the Sofia-Dragoman railway line

Performed activities:

Period: ,

Assignor: TERNA AD – BULGARIA BRANCH

Strengthening the excavation- Bul.. Cherni Vrah

Description: Execution of drilling and pouring piles f450 without casing, anchors R38 and shotcrete lining

Performed activities: , ,

Period: ,

Assignor: VANP Engineering Ltd

Reinforcement with borehole piles- . Galician

Description: Reinforcement with borehole piles- . Galician: implementation of drilling and pouring piles on ul. Galician: f470 x 12m , shotcrete lining and expansion tube construction

Performed activities: ,

Period: ,

Assignor: VITOSHA ENGINEERING 2000 Ltd.

Lidl grocery store, sunny Beach

Description: Construction of drilling and pouring piles f880 for the foundation of a grocery store

Performed activities:

Period:

Assignor: "PLANEX BURGAS" LTD

Construction of Druzhba - Expansion Street (ул.Обиколна), Iskar region, Sofia city

Description: Execution of drilling and pouring piles Ø620mm, L = 8м - 152no. For foundation of a retaining wall on a newly built road

Performed activities:

Period:

Assignor: STROYNORM EOOD

Strengthening of a construction excavation for Kosher complex, m. "Monastery meadows - east", Triaditsa district - SO, city. Sofia

Description: Reinforcement of excavation with compacted piles IPE 300 x 12 m и анкери R32 Изграждане на укрепителна конструкция за слаботоково кабелно трасе Изпълнение на 4 no. drilling and pouring piles f400 for foundation of a substation

Period:

Assignor: PIPE SYSTEM AD

Constructive strengthening of the existing foundations and strengthening of the ground base of the art gallery “Iliya Beshkov”, city. Pleven

Description: Strengthening the ground base with cuff injection inside and outside the building, execution of micropiles and drilling and pouring piles. Making new foundation slabs, screeds and floorings. Filling cracks, replacement of joinery and finishing works

Performed activities: ,

Period:

Assignor: Municipality of Pleven