Measures to strengthen MC1 and MC3 of the third metro line to the "Slatina" district
Description: Execution of secant borehole and discharge piles for ventilation system at MC1. Construction of Berlin Walls at accompanying tollification collectors and for strengthening excavations during the construction of the tunnel along the Milan route
Description: Execution of drilling and pouring piles F880, F1000, F1200, F1500 with casing pipe and suspension stabilizing drilling for foundation of various road facilities along the Sofia-Dragoman railway line
Description: Reinforcement with borehole piles- . Galician: implementation of drilling and pouring piles on ul. Galician: f470 x 12m , shotcrete lining and expansion tube construction
Strengthening of a construction excavation for Kosher complex, m. "Monastery meadows - east", Triaditsa district - SO, city. Sofia
Description: Reinforcement of excavation with compacted piles IPE 300 x 12 m и анкери R32
Изграждане на укрепителна конструкция за слаботоково кабелно трасе
Изпълнение на 4 no. drilling and pouring piles f400 for foundation of a substation
Constructive strengthening of the existing foundations and strengthening of the ground base of the art gallery “Iliya Beshkov”, city. Pleven
Description: Strengthening the ground base with cuff injection inside and outside the building, execution of micropiles and drilling and pouring piles. Making new foundation slabs, screeds and floorings. Filling cracks, replacement of joinery and finishing works