Reinforcement at road underpass at km. 114+730 in the railway section Kalitinovo - Khan Asparuh

Description: Road underpass in the railway section Kalitinovo - Khan Asparuh- implementation of Berlin Wall-type reinforcement with inventory lanes for the construction of a road underpass at km. 114+730

Performed activities:

Period: ,

Assignor: Trace Group Holding AD

Measures to strengthen MC1 and MC3 of the third metro line to the "Slatina" district

Description: Execution of secant borehole and discharge piles for ventilation system at MC1. Construction of Berlin Walls at accompanying tollification collectors and for strengthening excavations during the construction of the tunnel along the Milan route

Period:

Assignor: TRACE GROUP HOLD AD

Fortification of an ancient complex “Eastern Gate” of Philippopolis

Description: Fortification of an ancient complex "Eastern Gate" of Philippopolis - drilling with a pneumatic hammer and installation of piles, Modern concrete

Performed activities:

Period:

Assignor: D4 COMPANY LTD

Strengthening the excavation, Musagenitsa residential area

Description: Strengthening of a construction trench with driven piles IPE270x10 m, anchors R32 and shotcrete

Period: ,

Assignor: REZON-SA BUILD LTD

Strengthening of a construction excavation for Kosher complex, m. "Monastery meadows - east", Triaditsa district - SO, city. Sofia

Description: Reinforcement of excavation with compacted piles IPE 300 x 12 m и анкери R32 Изграждане на укрепителна конструкция за слаботоково кабелно трасе Изпълнение на 4 no. drilling and pouring piles f400 for foundation of a substation

Period:

Assignor: PIPE SYSTEM AD

Strengthening of a construction excavation and construction of a protective wall in case of demolition of an existing building on a site: Mixed-use building and underground garages in LPR IV -171, kv.535, m. Center - zone A - north, Oborishte district, Sofia city.

Description: Construction of a protective wall with height 10 m to protect the embassy on the river. Словакия при разрушаване на съществуваща сграда Укрепване на изкоп с дълбочина 8 m with NEA260 compaction piles with pre-auger drilling and R32 anchors

Period: ,

Assignor: FAIRPLAY INTERNATIONAL AD

Strengthening the construction excavation of a site: Heart and Brain Hospital, city. Burgas

Description: Implementation of IPE steel piles 270, L=10 (11) m with pre-auger drilling, sheathing, UPN connecting beam 240 and SAS28 rod screw anchor

Period:

Assignor: SMK Montazhi AD

Multifunctional residential building, r-n Izgrev, Sofia

Description: Reinforcement of a construction excavation with an anchored sheet pile fence

Period:

Assignor: Silur 2000 Ltd.

Reinforcement activities, m. SLAVIA, District "KRASNO SELO", city. Sofia

Description: Combined reinforcement with Berlin wall with planks and shotcrete and self-drilling anchors

Period:

Assignor: INFRA ROADS EOOD

Strengthening of an existing track during the construction of a pedestrian underpass

Description: Execution of the "Berlin Wall" at the pedestrian underpass at the station "Iskar" and the station "Poduyane"

Period:

Assignor: Glavbolgarstroy AD