APARTMENT HOTEL with bistro, shops and underground parking in. students' town, city. Sofia
Description: Implementation of reinforcement of construction excavation with compaction piles IPE270 x 10 m with pre-auger drilling, installation of unifying beam and anchors R32N
Viaduct repair and restoration works “KORENISHKI DOL” AT KM. 36+450 LEFT AND RIGHT CANVAS ON HEMUS”
Description: Slope reinforcement with permanent IBO anchors R51N x 3,90 m to 7,90 m and shotcrete; installation of packed piles IPE 240 x 8,0 m and wood paneling
Construction excavation in the district. Suhodol - town. Sofia
Description: Construction and installation work on strengthening slopes, including supply and driving of IPE300 steel piles, laying of shotcrete, transport, rent, installation and dismantling of the Berlin Wall, delivery and installation of injection anchors.
Strengthening of a construction trench for a reservoir - town. Sofia
Description: CMP for strengthening a tank trench including supply and installation of IPE borehole piles 270 x 8.0 m-36 pcs. Casting with concrete C12/16.