POLIMERINJEKT LTD

For your special needs

Reinforcement of retaining walls, White Lagoon complex, Balchik

Description: Execution of micropiles for reinforcement of retaining walls and injection of cement compositions for strengthening the ground base

Performed activities:

Period:

Assignor: "Techno Invest" Ltd.

New Television Building, city. Sofia

Description: Reinforcement of a trench with an anchored sheet pile wall, injection into the main joint and partial removal of sheet piling

Performed activities: , ,

Period:

Assignor: AT Engineering 2000 OOD

Excavation and strengthening measures for deep excavation 9 meters at Construction of a hotel on the street. Thessaloniki N24, city. Sofia

Description: Execution of reinforcement with steel piles NEA260x12 m with preliminary screw drilling and lining of reinforced shotcrete

Performed activities: ,

Period:

Assignor: Dimel 2005 Ltd.

ITAUWER, Salt market, Sofia city

Description: EXCAVATION AND REMOVAL OF EXISTING FLOORING, STEP-BY-STEP EXCAVATION WORKS, DESTRUCTION OF CONCRETE ELEMENTS INCLUDING TRANSPORTATION TO THE RELEVED DEPOT. DELIVERY OF MATERIAL AND INSTALLATION OF TEMPORARY PRESTRESSED ANCHORS ON SLOT WALL, DISASSEMBLY OF ANCHOR HEADS

Performed activities:

Period:

Assignor: "SHRABAG" EAD

Multifunctional residential building, r-n Izgrev, Sofia

Description: Reinforcement of a construction excavation with an anchored sheet pile fence

Period:

Assignor: Silur 2000 Ltd.

Reinforcement activities, m. SLAVIA, District "KRASNO SELO", city. Sofia

Description: Combined reinforcement with Berlin wall with planks and shotcrete and self-drilling anchors

Period:

Assignor: INFRA ROADS EOOD

RESIDENTIAL BUILDING WITH UNDERGROUND PARKING, m. "Camp", Krasno Selo district, city. Sofia

Description: Reinforcement of a construction excavation with a Berlin wall with IPE compaction piles 240, reinforced with shotcrete and self-drilling anchors R32

Performed activities: ,

Period:

Assignor: PLANEX TRADE LTD

Strengthening of an existing track during the construction of a pedestrian underpass

Description: Execution of the "Berlin Wall" at the pedestrian underpass at the station "Iskar" and the station "Poduyane"

Period:

Assignor: Glavbolgarstroy AD

Strengthening of a construction excavation in sq. East

Description: Execution of packed piles IPE300, IPE450, R38 anchors and steel mortar

Performed activities: ,

Period:

Assignor: Diana Steele, EU VI EU investment

We use cookies, to guarantee, that we provide you with the best experience on our website.
If you continue to use this site, we will accept, that you accept privacy policy!