projects

We implement solutions, that leave a mark

See our projects and get to know the experience and capabilities of our team.

Residential building in Regulated Land III-469, sq. 62, m. Boyana, Vitosha district

Description: Execution of soil nails: anchors R38 x 8m and R32 x 6m every 2m; anchor beams 2xUPN140 and shotcrete with arm. nets N8 20 / 20cm

Performed activities: ,

Period:

Assignor: ES BILD 1 Ltd.

Rehabilitation of viaducts and bridges on the Hemus Motorway

Description: Cleaning and shotcreting of crossbars, kolkoni, consoles and road plates

Performed activities: ,

Period:

Assignor: ORS Infrastructure

Extension of the metro in Sofia, third metro line

Description: Construction and installation works on constructions of ventilation and drainage station in the section MC14-MC12

Performed activities: ,

Period:

Assignor: Civil Society "DVU"

Strengthening the existing foundations of a building in the town of. Varna

Description: Bilateral structural reinforcement of existing foundations by means of R51N x micropiles 6 m, UPN220 unifying structures and laying shotcrete on walls

Performed activities: , ,

Period:

Assignor: DIANA COMMERCE EOOD

Wanted in k.k. "St.. st. Constantine and Helena ", city. Varna

Description: Implementation of reinforcement under the “Soil nailing” system

Performed activities: ,

Period:

Assignor: City Building Ltd.

Residential building with shops and underground garages, city. Varna

Description: Implementation of reinforcement under the “Soil nailing” system

Performed activities: ,

Period:

Assignor: DMI Investment

Road tunnel, Pleven-Lovech-Troyan Karnare

Description: Laying of sprayed concrete in a wet way on the vault and walls of a site: „Road II-305 Pleven-Lovech-Troyan Karnare from km 37+393 up to km 46+105, part Road tunnel from km 43+286 up to 43 + 699 ”

Performed activities: ,

Period:

Assignor: ASTRA INTERPROJECT LTD

Extension of the metro in Sofia, third metro line

Description: Reinforcement of a trench for a pedestrian underpass at the Council of Ministers 18, side Gorna Banya. Execution of drilling and pouring piles ф600 х 11,55 m, unifying reinforced concrete structure and steel struts

Period:

Assignor: "TRACE - Sofia" EAD

Reinforcement of an excavation at an existing retaining wall between a warehouse and a TEKLAS SA plant

Description: Strengthening of construction excavation for construction according to the "Soil nailing" system

Performed activities: ,

Period:

Assignor: K-KARDZH EOOD

Viaduct repair and restoration works “KORENISHKI DOL” AT KM. 36+450 LEFT AND RIGHT CANVAS ON HEMUS”

Description: Slope reinforcement with permanent IBO anchors R51N x 3,90 m to 7,90 m and shotcrete; installation of packed piles IPE 240 x 8,0 m and wood paneling

Period:

Assignor: GBS-Infrastructure Construction AD