Residential building in Regulated Land III-469, sq. 62, m. Boyana, Vitosha district

Description: Execution of soil nails: anchors R38 x 8m and R32 x 6m every 2m; anchor beams 2xUPN140 and shotcrete with arm. nets N8 20 / 20cm

Performed activities: ,

Period:

Assignor: ES BILD 1 Ltd.

Rehabilitation of viaducts and bridges on the Hemus Motorway

Description: Cleaning and shotcreting of crossbars, kolkoni, consoles and road plates

Performed activities: ,

Period:

Assignor: ORS Infrastructure

Extension of the metro in Sofia, third metro line

Description: Construction and installation works on constructions of ventilation and drainage station in the section MC14-MC12

Performed activities: ,

Period:

Assignor: Civil Society "DVU"

Strengthening the existing foundations of a building in the town of. Varna

Description: Bilateral structural reinforcement of existing foundations by means of R51N x micropiles 6 m, UPN220 unifying structures and laying shotcrete on walls

Performed activities: , ,

Period:

Assignor: DIANA COMMERCE EOOD

Wanted in k.k. "St.. st. Constantine and Helena ", city. Varna

Description: Implementation of reinforcement under the “Soil nailing” system

Performed activities: ,

Period:

Assignor: City Building Ltd.

Residential building with shops and underground garages, city. Varna

Description: Implementation of reinforcement under the “Soil nailing” system

Performed activities: ,

Period:

Assignor: DMI Investment

Road tunnel, Pleven-Lovech-Troyan Karnare

Description: Laying of sprayed concrete in a wet way on the vault and walls of a site: „Road II-305 Pleven-Lovech-Troyan Karnare from km 37+393 up to km 46+105, part Road tunnel from km 43+286 up to 43 + 699 ”

Performed activities: ,

Period:

Assignor: ASTRA INTERPROJECT LTD

Extension of the metro in Sofia, third metro line

Description: Reinforcement of a trench for a pedestrian underpass at the Council of Ministers 18, side Gorna Banya. Execution of drilling and pouring piles ф600 х 11,55 m, unifying reinforced concrete structure and steel struts

Period:

Assignor: "TRACE - Sofia" EAD

Reinforcement of an excavation at an existing retaining wall between a warehouse and a TEKLAS SA plant

Description: Strengthening of construction excavation for construction according to the "Soil nailing" system

Performed activities: ,

Period:

Assignor: K-KARDZH EOOD

Viaduct repair and restoration works “KORENISHKI DOL” AT KM. 36+450 LEFT AND RIGHT CANVAS ON HEMUS”

Description: Slope reinforcement with permanent IBO anchors R51N x 3,90 m to 7,90 m and shotcrete; installation of packed piles IPE 240 x 8,0 m and wood paneling

Period:

Assignor: GBS-Infrastructure Construction AD

We use cookies, to guarantee, that we provide you with the best experience on our website.
If you continue to use this site, we will accept, that you accept privacy policy!