Actions: anchor stabilization works (IBO R32/15).
Contractor: "Geotehnika ABS"
Period: 11.2008 Status: completed
view
Actions: installation of SAS stabilization anchors (SAS Ф50 Bst 500, SAS Ф36 Y1050).
Contractor: "Transstroy-Varna" Inc.
Period: 11.2008Status: completed
view
Actions: anchor stabilization works (IBO32S, IBO38).
Contractor: "Transstroy-Varna" Inc.
Period: 08.2008 Status: completed
view
Actions: excavation support works - spry concrete and soil nails (IBO R32/15).
Contractor: "Tomson Construct" GtmbH
Period: 07.2008Status: completed
view
Actions: drilling works for piles ф500; anchor support works (IBO R32/15).
Contractor: "Geotehnika ABS" LTD
Period: 07.2008 Status: completed
view
Actions: excavation support works - spry concrete and soil nails.
Contractor: "Slav Stroy" LTD
Period: 08.2008 Status: completed
view