Пилотно фундиране
Activities regarding construction of RC piles (up to ф600)
- Transportation of machines and materials to the construction site;
- Preparation of access site/road for the drilling rig machines with weight up to 50t (responsibility of the Contractor);
- Screw drilling with or w/o casing (depending on geology conditions) – depth according to design project;
- Installation of rebar sets;
- Concrete works;
- Casing removal.
Installation of driven piles – steel sections
- Transportation of machines and materials to the construction site;
- Preparation of access site/road for the drilling rig machines with weight up to 50t (responsibility of the Contractor);
- Pile driving according to design project